Skip to content

🔆 500 Units Electricity Bill in Gujarat

UGVCL / DGVCL / MGVCL / PGVCL - current slab rates, 2026

Bill for 500 units a month

₹2,265 + FPPPA

Average ₹4.53 per unit; your last units cost ₹5.20 each.

FPPPA (a per-unit fuel and power purchase charge revised every quarter) is billed on top and is not included.

How the 500-unit bill adds up

Slab (units per month)UnitsRateCharge
1-5050₹3.05₹153
51-10050₹3.50₹175
101-250150₹4.15₹623
Above 250250₹5.20₹1,300
Fixed charge (fixed charge for a 2 kW connection)₹15
Total (before electricity duty)₹2,265

Source: GERC Tariff Order for UGVCL, Case No. 2584 of 2025 dated 25 Mar 2026 (FY 2026-27), Part I, Rate RGP. Last verified 2026-11-08. Estimate only; check your latest UGVCL, MGVCL, PGVCL bill.

What a little more or less would cost

Units per monthBillAvg. per unit
400 units₹1,745₹4.36
450 units₹2,005₹4.46
500 units (this page)₹2,265₹4.53
550 units₹2,525₹4.59
600 units₹2,785₹4.64

Cutting back to 250 units would bring the bill down to ₹965, saving ₹1,300 a month.

Try your own units (Gujarat, monthly)

UGVCL / MGVCL / PGVCL / DGVCL: GERC Tariff Order for UGVCL, Case No. 2584 of 2025 dated 25 Mar 2026 (FY 2026-27), Part I, Rate RGP. Last verified 2026-11-08.

FPPPA (a per-unit fuel and power purchase charge revised every quarter) is billed on top and is not included.

Check your bill; most homes are 1 to 5 kW.

Estimated Monthly Bill

₹2,378

500 units - Avg ₹4.76/unit

Bill breakdown

Units 1-5050 units x ₹3.05/unit₹153
Units 51-10050 units x ₹3.50/unit₹175
Units 101-250150 units x ₹4.15/unit₹623
Units 251+250 units x ₹5.20/unit₹1,300
Energy charges₹2,250
Fixed charge (2 kW)₹15
Electricity duty (approx 5%)₹113
Total₹2,378

Monthly bill

₹2,378

Quarterly

₹7,134

Annual estimate

₹28,536

Tips to reduce your bill

  • - Switch to 5-star BEE-rated appliances - they use 30-50% less electricity
  • - Use LED bulbs (7W LED = 60W incandescent in brightness)
  • - Set AC to 24-26 degrees C - each degree below 24 increases consumption ~6%
  • - Avoid peak hours (6-10 PM) if your DISCOM has time-of-use tariffs
  • - A 1kW solar rooftop panel generates ~100-120 units/month in India

Estimate for a domestic connection. Fuel adjustment charges, electricity duty and other state levies change often and vary by state, so your actual bill can differ. Check your DISCOM website or latest electricity bill for exact rates.

500 units a month: Gujarat vs other states

Monthly bill for the same usage at each state's current domestic tariff, before electricity duty, fuel adjustment charges and any opt-in subsidy.

FAQs - 500 units electricity bill in Gujarat

How much is the electricity bill for 500 units in Gujarat?▾

Using 500 units a month in Gujarat costs about ₹2,265 at current UGVCL, MGVCL, PGVCL rates, including the fixed charge (fixed charge for a 2 kW connection) but before electricity duty. FPPPA (a per-unit fuel and power purchase charge revised every quarter) is billed on top and is not included.

How is the 500-unit bill calculated?▾

Slabs are charged one band at a time: 50 units at ₹3.05 = ₹153, 50 units at ₹3.50 = ₹175, 150 units at ₹4.15 = ₹623, 250 units at ₹5.20 = ₹1,300. Then the fixed charge of ₹15 is added, for a total of ₹2,265.

What is the per unit cost at 500 units in Gujarat?▾

At 500 units the average works out to ₹4.53 per unit including the fixed charge, while your last units are charged at ₹5.20 per unit. The average rises as usage moves into higher slabs.

How much more does it cost to use 50 more units?▾

Going from 500 to 550 units raises the bill from ₹2,265 to ₹2,525, an extra ₹260.

Which charges are not included in this 500-unit bill?▾

Electricity duty and state taxes are not included, and neither are fuel or power purchase adjustment charges that change every quarter (FPPPA). Your actual bill can be somewhat higher than the figure shown here.

Is a 500-unit bill cheaper in other states?▾

For the same 500 units a month, the bill ranges from ₹2,190 in Delhi to ₹6,492 in Maharashtra across the states we cover, because each state sets its own slabs, fixed charges and subsidies.